Li–S BESS Prototype (42 Ah, 48 V)
Grid-scale Energy
Storage
Led development and validation of a lithium-sulfur battery energy
storage prototype, including cell design, module integration, and
field testing with academic partners.
- Defined cell requirements and module architecture.
- Coordinated formation, cycling, and safety validation.
- Collaborated with external labs for independent testing.
Electrolyte & Separator DOE Platform
Li–S and Li-metal
Cells
Built a structured DOE framework to evaluate electrolyte and
separator combinations, supported by automated data analysis.
- Designed factorial DOEs for multiple formulations.
- Implemented Python-based data pipelines for Neware data.
- Identified stable low-shuttle electrolyte windows.
Pilot-line Cell Manufacturing Support
Process Development
Supported transition from R&D cells to pilot-line production by
refining coating, stacking, and formation processes.
- Optimized cathode loading and coating uniformity.
- Defined acceptance criteria using SPC and capability indices.
- Collaborated with equipment vendors and operators.